2026 / May 11 to June 11, the crews maintained the following the ditches:
• Ditch 10 – Our crew slope mowed this ditch, and routine steps were maintained for efficiency and safety.
• Ditch 10A and B – There were no issues with mowing the entire system.
2026 / June 8 to June 11, the crews maintained the following the ditches:
• Ditch 10B (near Westward) and Ditch 11 (near the National Guard building) – Our crew slope mowed this ditch, with no unusual observations or safety concerns.