Ditch 10 and 11 Watershed



On May 24, 2023 we finished ditch 10A. We were able to spray ditch bottom. This includes Westward Street, the high school and all the way to I45.

• Ditch 10 – 8/15/2023 and 8/16/2023 - Our crew spayed and mowed this ditch, and no unusual occurrences took place.
• Ditch 10B, 10C, 10D – 9/20/2023 and 9/21/2023 - Our crew mowed and spayed these ditches, mowed the high school slope, and near the daycare. This was done well by our crew, with great efficiency to complete the task.
• Ditch 10B – 10/16/2023 - Our crew spayed and mowed this ditch, and there were no issues with mowing the entire system.
• Ditch 10A– 11/7/2023 - Our crew mowed this entire ditch system, with no unusual incidents to report.



During the month of March 4 through March 12, 2024

The crew sprayed weed killer and mowed in the bottom of the ditches. Routine steps were maintained for efficiency and safety.
The following ditches were mowed during this time period:
• Ditch 10A (3/4/2024)
• Ditch 10B (3/4/2024)
• Ditch 10B (3/4/2024)
• Ditch 10B (3/7/2024)
• Ditch 10B (3/11/2024)
• Ditch 10B (3/12/2024)