Ditch 9 Watershed



From the dates of May 8 to June 11, 2025, the following tasks took place on the following ditches:

• Ditch 9 – Our crew mowed and sprayed herbicide on this ditch, and no unusual occurrences took place. Safety was taken as always when mowing this ditch.
This was on done on a few occasions during this time frame.

For the month of August - Ditch 9 was mowed. This ditch was also sprayed.

For the month of September - Ditch 9 was mowed, and later, the crew went back to slope mow the same ditch.
Additionally, on September 24, 2025, the GCDD2 crew mowed the ditch, with no unusual occurrences taking place as they were mowing at the ditch.
  • ditch 9 06 13 24 01
    ditch 9 06 13 24 01
  • ditch 9 06 13 24 02
    ditch 9 06 13 24 02