Ditch 5 Watershed




Ditch 5 – From May 8 to June 11, our crew spayed herbicide and mowed this ditch, with no unusual occurrences taking place.

For the month of August - Ditch 5 A was mowed.

For the month of September - Ditch 5 A and B was mowed. These ditches were also slope mowed at a later time in the month.

Ditch 5A

  • ditch 5 06 13 24 01
    ditch 5 06 13 24 01

Ditch 5B

  • ditch 5b 06 13 24 01
    ditch 5b 06 13 24 01