From the dates of May 8 to June 11, the crews maintained the following the ditches:
• Ditch 10 – Our crew mowed and sprayed herbicide on this ditch, observing no unusual issues.
• Ditch 10A and B – There were no issues with mowing the entire system. Where they could, the crews also slope mowed in the drier areas.
• Ditch 10B (near Westward) and Ditch 11 (near the National Guard building) – Our crew mowed this ditch system, taking caution, staying safe, and using great care to safely perform the task.
For the month of August - Ditch 10 B was mowed.
For the month of September - Ditch 10 A and B was mowed. Later in the month, the crew went back to slope mow these ditches also.